Because the location where we needed to pour concrete was inacessable to the concrete trucks, we had to hire a boom-pump truck. With its boom fully extended it could reach a hundred and ten feet.



We hired a local concrete contractor to help with the pour. We had hired them before and they enjoyed doing this job because of the unique nature of the project.




Halfway through the project and still going strong.



Bhima wouuld like to come into the barn and help with the pouring of the concrete. However we have a full crew for this job and Bhima doesn't have his rubber boots with him.



76 1/2 yards of concrete later and the job is finished.



"Ah, now I can come up the ramp and get back into the barn. Thanks guys, you did a good job!" Bhima exclaims.